Pararach, S. (2015). An Improvement of Total Flowtime and Makespan for the General Flow Shop Scheduling Problem Via O(n4m) Algorithm. Science & Technology Asia, 14(4), 38–46. Retrieved from https://ph02.tci-thaijo.org/index.php/SciTechAsia/article/view/41345