Pararach, S. (2015) “An Improvement of Total Flowtime and Makespan for the General Flow Shop Scheduling Problem Via O(n4m) Algorithm”, Science & Technology Asia, 14(4), pp. 38–46. Available at: https://ph02.tci-thaijo.org/index.php/SciTechAsia/article/view/41345 (Accessed: 29 April 2024).