[1]
S. Pararach, “An Improvement of Total Flowtime and Makespan for the General Flow Shop Scheduling Problem Via O(n4m) Algorithm”, Sci Tech Asia, vol. 14, no. 4, pp. 38–46, Oct. 2015.