1.
Pararach S. An Improvement of Total Flowtime and Makespan for the General Flow Shop Scheduling Problem Via O(n4m) Algorithm. Sci Tech Asia [internet]. 2015 Oct. 26 [cited 2026 Apr. 22];14(4):38-46. available from: https://ph02.tci-thaijo.org/index.php/SciTechAsia/article/view/41345