1.
Pararach S. An Improvement of Total Flowtime and Makespan for the General Flow Shop Scheduling Problem Via O(n4m) Algorithm. Sci Tech Asia [Internet]. 2015 Oct. 26 [cited 2024 Apr. 25];14(4):38-46. Available from: https://ph02.tci-thaijo.org/index.php/SciTechAsia/article/view/41345