[1]
Puttasorn, N., Varoonchotikul, T., Junin, W. and Chaimanee, A. 2022. Heuristic to Minimize the Number of Tardy Jobs for 2-Stages Assembly Scheduling Problem. Thai Journal of Operations Research : TJOR. 10, 1 (Jun. 2022), 113–127.