Puttasorn, N., Varoonchotikul, T., Junin, W. and Chaimanee, A. (2022) “Heuristic to Minimize the Number of Tardy Jobs for 2-Stages Assembly Scheduling Problem”, Thai Journal of Operations Research : TJOR, 10(1), pp. 113–127. available at: https://ph02.tci-thaijo.org/index.php/TJOR/article/view/246013 (accessed: 12 September 2026).