Analysis Data Component in Daily Reports to Pursue the Progress of Public Construction Sector Projects in Thailand

Authors

  • Parinya Nabandit Students, Master of Engineering Program in Civil Engineering, Faculty of Engineering, Khon Kaen University
  • Korb Srinavin Associate Professor, Department of Civil Engineering, Faculty of Engineering, Khon Kaen University

Keywords:

Progress monitoring, Daily work report, Construction field data

Abstract

Daily report data from Thailand's public construction sector has complicated or revealed significant issues for work that require specific qualities to be stored, as well as reporting issues with unclear information. Reliability concerns that contradict reality or provide information for personal benefit. Consequently, the purpose of this research is to study issues that must be reported in a daily report. To be used to pursue the progress of public construction sector projects in Thailand. Data were collected from 403 participants through a questionnaire covering 35 daily report items and analyzed using factor analysis. The results of the study concluded that topics can be organized into five groups, consisting of: 1) management and operation planning; 2) safety management and problems. 3) Identification of construction project information; 4) Evaluation of construction work; 5) Checking weather conditions as a priority.

References

Woldesenbet A, Jeong DHS, Oberlender GD. Daily work reports–based production rate estimation for highway projects. Journal of Construction Engineering and Management. 2012 Apr;138(4):481–90.

Elazouni A, Salem OA. Progress monitoring of construction projects using pattern recognition techniques. Construction Management and Economics. 2011 Apr;29(4):355–70.

Neuman WL. Social research methods: Quantitative and qualitative approaches [2nd ed.]. Boston: Pearson; 2006.

Pranee. Finding quality of measurement and evaluation tools. Yala: Yala Rajabhat University; 2016.

Darus N, Haron Z, Mohd Bakhori SN, Ming Han L, Jahya Z, Abdul Hamid MF. Construction noise annoyance among the public residents. Jurnal Teknologi. 2015 May 25;74(4).

Akadiri PO. Development of a multi-criteria approach for the selection of sustainable materials for building projects [Master's thesis]. Wolverhampton: University of Wolverhampton; 2011.

Field A, E W. Discovering statistics using SPSS. 3rd ed. + Using IBM SPSS Statistics for research methods and social science statistics. 4th ed. Thousand Oaks: Sage Publications; 2012.

Wangcharoen S. Report progress in construction. Bangkok: School of Engineering, King Mongkut's Institute of Technology Ladkrabang; 2003.

Connecticut Department of Transportation. Preliminary Engineering Report [online] 2011 [cited 2024 Mar 10]. Available from: https://portal.ct.gov/-/media/dot/documents/dconsultdesign/ mnrrstudycanalstreetvolume4110401cpdf.pdf

Woldesenbet A, Jeong HD, Park H. Framework for integrating and assessing highway infrastructure data. Journal of Management in Engineering. 2016 Jan;32(1).

Bunnag S. Monitoring progress in construction project via internet system by means of web-based technology [Master's thesis]. Bangkok: King Mongkut’s University of Technology Thonburi; 2003.

Minnesota Department of Transportation. Contract Administration Manual [online] 2009 [cited 2024 Mar 10]. Available from: https://www.dot.state.mn.us/const/manuals/contractadmin/cam.pdf

Lee KM, Shin WS, Lee DE, Kim DY, Son CB. Information constitution of daily job-site report for specialty contractors. Proceedings of the Korean Institute of Building Construction Conference. 2012 Nov;12(2):279–80.

Russell AD. Computerized daily site reporting. Journal of Construction Engineering and Management. 1993 Jun;119(2):385–402.

Shiau YC, Wang MT, Tsai TP, Wang WC. Developing a construction integrated management system. NIST Special Publication. 2003:27–34.

Arampongpun N. Studies of work progress reporting system in building construction using the earned value method [Master's thesis]. Bangkok: King Mongkut’s University of Technology Thonburi; 1999.

Shiau YC, Wang WC. Daily report module for construction management information system. Proceedings of the 20th ISARC. Eindhoven, Holland, 2003:603–609.

Yoo DU, Hong EH, Choi BS, Chae MJ, Chun JY. Improvement plan of daily work accomplishment index based process management based on lean construction principles. Architectural Research. 2018;20(4):147–152.

The American Association of State Highway and Transportation Officials. AASHTOWare Project SiteManager™ training guide for field staff at the Tennessee Department of Transportation [online] 2017 [cited 2024 Mar 10]. Available from: https://www.tn.gov/content/dam/tn/tdot/construction/ old_web_page/AASHTOWare_Project_SiteManager_Training_Guide_Field_Staff.pdf

Doloi H, Sawhney A, Iyer KC, Rentala S. Analysing factors affecting delays in Indian construction projects. International Journal of Project Management. 2012 May;30(4):479–489.

Krejcie RV, Morgan DW. Determining sample size for research activities. Educational and Psychological Measurement [Internet]. 1970 Sep;30(3):607–10. Available from: https://journals.sagepub.com/ doi/10.1177/001316447003000308

Cho J, Lee G, Song T, Jeong HD. Chatbot-engaged construction daily work report using mobile messenger. Automation in Construction. 2023 Oct 1;154:105007–7.

Tayaraukham S. Research methodology for humanities and social sciences. Kalasin: Prasan Printing; 2010.

Phuseeorn S. Using SPSS to analyze research data. 2nd ed. Mahasarakham: Taksila Printing; 2018.

Weekly report form (WeeklyReport.xlsx). Construction Supervision Division Department of Public Works and Town and Country Planning [online] 2021 [cited 2024 Mar 10]. Available from: https://office.dpt.go.th/web-upload/11xc410600758f76a9b83604e779b2d1de5/m_ document/20895/2767/file_download/59f8f3ecb98e351cda3a98adfb364d5a.xlsx

Monthly performance progress report form. Road Construction Bureau 1 Department of Highways [online] 2016 [cited 2024 Mar 10]. Available from: https://www.roadcon1.com/download/250422_ 151613.xlsx

Construction Project Regional Irrigation Office 2. Work manual on construction work performed. Lampang: Regional Irrigation Office 2; 2018.

Downloads

Published

2025-04-17

Issue

Section

บทความวิจัย