Ighravwe, Desmond Eseoghene, and Sunday Ayoola Oke. “A Green Preventive Maintenance Model Incorporating the Green Fuzzy Deployment Method with the WASPAS Approach for Production Lines: doi: 10.14456/mijet.2022.3”. Engineering Access 8, no. 1 (July 17, 2021): 22–30. accessed September 12, 2026. https://ph02.tci-thaijo.org/index.php/mijet/article/view/243417.