Ighravwe, Desmond Eseoghene, and Sunday Ayoola Oke. “A Green Preventive Maintenance Model Incorporating the Green Fuzzy Deployment Method With the WASPAS Approach for Production Lines: Doi: 10.14456/Mijet.2022.3”. Engineering Access 8, no. 1 (July 17, 2021): 22–30. Accessed May 5, 2024. https://ph02.tci-thaijo.org/index.php/mijet/article/view/243417.