นิธิกาญจนธาร จิตติวัฒน์. 2018. “The Time Delay Control of the Technique PERT/CPM TOT Public Company Limited Case Study: The Project to Install Speed Fiber to the x (FTTx) at the NGV Stations PTT Pathum Thani”. Srinakharinwirot University Engineering Journal 13 (1). Bangkok, Thailand:13-26. https://ph02.tci-thaijo.org/index.php/sej/article/view/140208.