Asset Management for Power Transformer in High Voltage Substation

Main Article Content

Thanapong Suwanasri
Rattanakorn Phadungthin
Cattareeya Suwanasri

Abstract

In this paper, an innovative asset management in inventory control of power transformer in high voltage substation is proposed. Using Pareto analysis, the components of power transformer are classified into ABC Classes. Class A means the few most expensive ones that need special care. Class B means ordinary ones that need standard care. Class C means the large number of cheap items that need little care. The inventory management strategies as statistical distribution methods, economic ordering policy, and two-bin policy are initiatively applied to the transformer components in the ABC Classes. Finally, the optimum number of spare parts, the optimum ordering quantity, the suitable time for reordering, and the saving inventory cost are determined in order to minimize the total inventory cost. The power transformer fleet in Thailand is presented as example of inventory control of transmission asset.

Article Details

How to Cite
Suwanasri, T., Phadungthin, R., & Suwanasri, C. (2012). Asset Management for Power Transformer in High Voltage Substation. ECTI Transactions on Electrical Engineering, Electronics, and Communications, 11(1), 9–17. https://doi.org/10.37936/ecti-eec.2013111.170580
Section
Electrical Power Systems

References

[1] Cigre Working Group A2.34, Guide for Transformer Maintenance, February 2011.

[2] J. Schneider, A. Gaul, C. Neumann, J. Hograefer, W.Well ow, M. Schwan, A. Schnettler, Asset Management Techniques, Power Systems Computation Conference, Liege, August 2005.

[3] Cigre Working Group C1.1, Asset Management of Transmission Systems and Associated Cigre Activities, December 2006.

[4] G. Balzer, F. Heil, P. Kirchesch, R. Meister, C. Neumann, Evaluation of Failure Data of HV Circuit-Breakers for Condition Based Maintenance, Cigre Session 2004.

[5] M. Schwan, W. H. Well ow, A. Schnettler, U. Zickler, M. Roth, J. Schneider, Risk-based Asset Maintenance for Substations in Distribution Networks Considering Component Reliability, Cigre 2006.

[6] L. G. Zomerdijk, J. De Vries, An Organizational Perspective on Inventory Control: Theory and a Case Study, International Journal of Production Economics, 2003.

[7] A. M. Leite da Silva, J. G. De Carvalho Costa, A. A. Chowdhury, “Probabilistic Methodologies for Determining the Optimal Number of Substation Spare Transformers," IEEE Transactions on Power Systems, Vol. 25, No. 1, February 2010.

[8] V. I. Kogan, C. J. Roeger, D.E. Tipton, “Substation Distribution Transformers Failures and Spares," IEEE Transactions on Power Systems, Vol. 11, No. 4, November 1996.

[9] W. Li, E. Vaahedi, Y. Mansour, “Determining Number and Timing of Substation Spare Transformers Using a Probabilistic Cost Analysis Approach," IEEE Transactions on Power Delivery, Vol. 14, No. 3, July 1999.

[10] A. A. Crowdhury, D. O. Koval, “Development of Probabilistic Models for Computing Optimal Distribution Substation Spare Transformers," IEEE Transactions on Industry Applications, Vol. 41, No. 6, November 2005.

[11] P. Alstrom, “Numerical Computation of Inventory Policies, Based on the EOQ/x value for Order-Point Systems," International Journal of Production Economics, 2001.

[12] A. Tanwari, A. Qayoomlakhiar, G. Y. Shaikh, “ABC Analysis as a inventory Control Technique," Quaid-E-Awam University Research Journal of Engineering, Science and Technology, Vol. 1, No. 1, January-June 2000.

[13] Y. Chen, K. W. Li, J. Levy, K. W. Hipel, D. M. Kilgour, A Rough Set Approach to Multiple Criteria ABC Analysis, Springer LNCS Transactions on Rough Sets, in press, 2008.

[14] D. Waters, Inventory Control and Management, John Wiley & Sons Inc., 2003.

[15] O. Salih Duffuaa, A. Raouf, J. Dixon Campbell, Planning and Control of Maintenance Systems, John Wiley & Sons Inc., 1999.

[16] D. Louit, R. Pascual, D. Banjevic, “Optimization Models for Critical Spare Parts Inventories - Reliability Approach," Journal of the Operational Research Society, 2010.

[17] J. Viale, David, Basics of Inventory Management: from Warehouse to Distribution Center, Thomson Course Technology, 1996.

[18] H. Kai Chan, F. T. S. Chan, “Early Order Completion Contract Approach to Minimize the Impact of demand Uncertainty on Supply Chains," IEEE Transactions on Industrial Informatics, Vol. 2, No. 1, February 2006.

[19] Z. Lianfu, Z. Shuzhi, W. Min, Z. Zhihui, Z. Yonggang, “Analyzing on Impact Factors of Safety stock under Random Requirement," International Conference on Networks Security, Wireless Communications and Trusted Computing, 2009.

[20] IEEE Std. C37.10TM-1995 (R2002), IEEE Guide for Diagnostics and Failure Investigation of Power Circuit Breakers, 1995.