Process Improvement to Reduce Engine Transferring Time

Main Article Content

Usawadee Inklay
Patanapong Sanghatawatana

Abstract

This research aims to reduce aircraft ‘s engine transferring time of case study company A. There is technical department in the company, which core competencies are repairing and maintenance passenger aircraft fleet. This work applies motion and time study for determining the operation standard time and uses cause and effect diagram for identifying the root cause of the long engine transferring time. In deep analysis of time study, the data reveals that preparing hi-lifting jack process is main problem because it takes the longest processing time and lot of work force that causes technicians to become fatigue. Hence, this research applies Eliminate, Combine, Rearrange and Simplify concept (ECRS) and design theory to develop auxiliary equipment for engine transferring operation. Next, the proposed equipment is tested in real operation. The results indicate that the proposed equipment can be applied efficiently for this process and reduced the engine transferring time significantly from 125 minutes (before improvement) to 73 minutes (after improvement).

Article Details

Section
Research Articles

References

รัชต์วรรณ กาญจนปัญญาคม, INDUSTRIAL WORK STUDY การศึกษางานอุตสาหกรรม, บริษัท สำนักพิมพ์ ท็อป จำกัด, 2550

วันชัย ธิจิรวนิช, การศึกษาการทำงานหลักการและกรณีศึกษา, สำนักพิมพ์จุฬาลงกรณ์มหาวิทยาลัย, 2539

โอกุระ ฮิโตชิ, วิเชียร เบญจวัฒนาผล, สมชัย อัครทิวา, Why-Why Analysis เทคนิคการวิเคราะห์อย่างถึงแก่น เพื่อปรับปรุงสถานประกอบการ, สำนักพิมพ์ ส.ส.ท สมาคมส่งเสริมเทคโนโลยี (ไทย-ญี่ปุ่น), 2550

มนัส สังวรศิลป์, ธนพงค์ ไชยชนะ, เริ่มต้นการใช้งาน CATIA เวอร์ชั่น 5, สำนักพิมพ์ Advance information, 2549

เสกสรร ไซยจิตต์, คอมพิวเตอร์ช่วยในการออกแบบวิศวกรรมด้วยโปรแกรม CATIA V5, สำนักพิมพ์ ธนภัทร (2006) พริ้นติ้ง, 2555