Availability and Performance Analysis of Primary Treatment Unit of Sewage Plant

Authors

  • Monika Saini Department of Mathematics and Statistics, Manipal University Jaipur, Jaipur, India
  • Drishty Goyal Department of Mathematics and Statistics, Manipal University Jaipur, Jaipur, India
  • Ashish Kumar Department of Mathematics and Statistics, Manipal University Jaipur, Jaipur, India

Keywords:

Availability, exponential distribution, performance analysis, supplementary variable technique, Markov birth-death process

Abstract

The main objective of present study is to analyze availability and performance of primary treatment unit of sewage plant (STP) with component wise redundancy. For this purpose, a novel mathematical model for availability and performance analysis of primary unit of sewage treatment plant has been proposed introducing the concept of redundancy and constant failure rates. Primary unit of sewage treatment system is a serial process system in which five subsystems comprises in series structure. The system has been analyzed using Markov birth-death process, Chapman-Kolmogorov differential equation and supplementary variable technique. All the repair rates considered as arbitrarily distributed. The needful data has been taken with the help of the maintenance personnel of the plant. Numerical and graphical results of the study have been appended for a particular case and the results also shared with the plant personnel.

References

Adhikary DD, Bose GK, Chattopadhyay S, Mitra S. RAM investigation of coal fired thermal power plants: a case study. Int J Ind Eng Comput. 2012; 3: 423-434.

Aggarwal AK, Singh V, Kumar S. Availability analysis and performance optimization of a butter oil production system: a case study. Int J Syst Assur Eng Manag. 2014; 8: 538-554.

Ardakan MA, Hamadani AZ. Reliability-redundancy allocation problem with cold standby redundancy strategy. Simul Model Pract Theory. 2014; 42(3):107-118.

Behera SK, Dash AP. Performance analysis of coal fired power plants in India. Proceedings of the International Conference on Industrial Engineering and Operations Management, Dhaka, Bangladesh. 2010; 1-6.

Gandhi OP, Sehgal R, Angra S. Failure cause identification of tribo-mechanical system. Reliab Eng Syst Saf. 2003; 65: 259-270.

Gowid S, Dixon R, Ghani S. Optimization of reliability and maintenance of liquefaction system on FLNG terminals using Markov modeling. Int J Qual Reliab Manage. 2014; 31(3): 293-310.

Gupta P, Lal AK, Sharma RK, Singh J. Numerical analysis of reliability and availability of the serial processes in butter‐oil processing plant. Int J Qual Reliab Manage. 2005; 22(3): 303-316.

Gupta N, Kumar A, Saini M. Reliability and maintainability investigation of generator in steam turbine power plant using RAMD analysis. J Phys Conf Ser. 2021; 1714 (1), https://doi.org/10.1088/

-6596/1714/1/012009.

Gupta S, Tewari PC, Sharma AK. Performance modeling and decision support system of feed water unit of a thermal power plant. South African J Ind Eng. 2008; 19(2): 125-134.

Gupta N, Saini M, Kumar A. Operational availability analysis of generators in steam turbine power plants. SN Appl Sci. 2020; 2(4), https://doi.org/10.1007/s42452-020-2520-y.

Goyal D, Kumar A, Saini M, Joshi H. Reliability, maintainability and sensitivity analysis of physical processing unit of sewage treatment plant. SN Appl Sci. 2019; 1(11), https://doi.org/10.1007/

s42452-019-1544-7.

Jesus S, Francisco G. Availability analysis of gas turbines used in power plants. Int J Thermodyn. 2009; 12: 28-37.

Khanduja R, Tewari PC, Kumar D. Steady state behavior and maintenance planning of bleaching system in a paper plant. Int J Indust Eng. 2012; 7(12): 39-44.

Khanduja R, Tewari PC, Chauhan RS. Performance modeling and optimization for the stock preparation unit of a paper plant using genetic algorithm. Int J Qual Reliab Manage. 2011; 28 (6): 688-703.

Kumar D, Singh I, Pandey PC. Maintenance planning of pulping system in paper industry. Reliab Eng Syst Saf. 1989; 25(4): 293-302.

Kumar A, Singh R, Saini M, Dahiya O. Reliability, availability and maintainability analysis to improve the operational performance of soft water treatment and supply plant. J Eng Sci Technol Rev. 2020; 13(5): 183-192.

Kumar P, Tewari PC. Performance analysis and optimization for CSDGB filling system of a beverage plant using particle swarm optimization. Int J Ind Eng Comput. 2017; 8: 303-314.

Kumar S, Tewari PC, Sharma R. Simulated availability of CO2 cooling system in a fertilizer plant. Industr Eng J. 2007; 36(10): 19-23.

Kumar A, Ram M, Rawat RS. Optimization of casting process through reliability approach. Int J Qual Reliab Manage. 2017; 34(6): 833-848.

Marseguerra M, Zio E, Martorell S. Basics of genetic algorithms (GA) optimization for RAMS applications. Reliab Eng Syst Saf. 2006; 91(9): 977-991.

Mishra S, Bhardwaj P, Bhadauria N. Optimal availability analysis of brake drum manufacturing system by using Markov approach. Int J Eng Technol Manage Appl Sci. 2016; 4: 147-154.

Modgil V, Sharma SK, Singh J. Performance modeling and availability analysis of shoe upper manufacturing unit. Int J Qual Reliab Manage. 2013; 30(8): 816-831.

Niwas R, Garg H. An approach for analyzing the reliability and profit of an industrial system based on the cost-free warranty policy. J Braz Soc Mech Sci Eng. 2018; 40, https://doi.org/10.1007/

s40430-018-1167-8.

Pandey P, Mukhopadhyay AK, Chattopadhyaya S. Reliability analysis and failure rate evaluation for critical subsystems of the dragline. J Braz Soc Mech Sci Eng. 2018; 40:50.

Ram M, Kumar A. Performability analysis of a system under 1-out-of-2: G scheme with perfect reworking. J Braz Soc Mech Sci Eng. 2015; 37:1029.

Sabouhi H, Abbaspour A, Firuzabad M, Dehghanian P. Reliability Modeling and Availability Analysis of Combined Cycle Power Plants. Int J Elec Power. 2016; 79: 108-119.

Sachdeva A, Kumar D, Kumar P. Reliability analysis of pulping system using Petri nets. Int J Qual Reliab Manage. 2008; 25(8): 860-877.

Shahrzad FR, Xie Min, Kien MN, Richard CMY Dynamic availability assessment and optimal component design of multi-state weighted k-out-of-n systems. Reliab Eng Syst Saf. 2014; 123(3): 57-62.

Saini M, Kumar A. Performance analysis of evaporation system in sugar industry using RAMD analysis. J Braz Soc Mech Sci Eng. 2019; 41(4), https://doi.org/10.1007/s40430-019-1681-3.

Singh J. A warm stand-by redundant system with common cause failures. Reliab Eng Syst Saf. 1989; 26: 135-141.

Singh J, Mahajan P. Reliability of utensils manufacturing plant-a case study. Oper Res. 1999; 36(3): 260-269.

Sinha RS, Mukhopadhyay AK. Failure analysis of jaw crusher and its components using ANOVA. J Braz Soc Mech Sci Eng. 2016; 38(2): 665-678.

Sinwar D, Saini M, Singh D, Goyal D, Kumar A. Availability and performance optimization of physical processing unit in sewage treatment plant using genetic algorithm and particle swarm optimization. Int J Syst Assur Eng Manage. 2021; 12(1): 1-12.

Yu H, Chu C, Châtelet E, Yalaoui F. Reliability optimization of a redundant system with failure dependencies. Reliab Eng Syst Saf. 2007; 92: 1627-1634.

Downloads

Published

2023-03-29

How to Cite

Saini, M. ., Goyal , D. ., & Kumar, A. . (2023). Availability and Performance Analysis of Primary Treatment Unit of Sewage Plant. Thailand Statistician, 21(2), 383–396. Retrieved from https://ph02.tci-thaijo.org/index.php/thaistat/article/view/249008

Issue

Section

Articles