การศึกษาการจัดสรรน้ำของระบบอ่างเก็บน้ำในลุ่มน้ำปราจีนบุรี-บางปะกงด้วย Mike Basin Model
Main Article Content
Abstract
The study used application of MIKE BASIN model to simulate the events by analyzing the Water Balance method. The studies revealed that the watershed condition model in the current year. The demand for water Prachinburi-Bangpakong watershed area is equal to 2,366.48 MCM/year, BangpakongRiver sub-watershed had maximum demand for water is 874.31 MCM/year, Hanuman watershed had minimum demand for water is 6.83 MCM/year. The watershed condition model in the short-term future. The demand for water Prachinburi-Bangpakong watershed area is equal to 2,615.49 MCM/year, Bangpakong River sub-watershed had maximum demand for water is 878.06 MCM/year, KlongPraprong sub-watershed had minimum demand for water is 40.09 MCM/year. The watershed condition model in the medium-term future. The demand for water Prachinburi-Bangpakong watershed area is equal to 2,622.75 MCM/year, BangpakongRiver sub-watershed had maximum demand for water is 880.24 MCM/year, KlongPraprong sub-watershed had minimum demand for water is 41.48 MCM/year.And the watershed condition model in the long-term future. The demand for water Prachinburi-Bangpakong watershed area is equal to 2,637.39 MCM/year, Bangpakong River sub-watershed had maximum demand for water is 885.41 MCM/year, KlongPraprong sub-watershed had minimum demand for water is 42.27 MCM/year.
Article Details
The published articles are copyright of the Engineering Journal of Research and Development, The Engineering Institute of Thailand Under H.M. The King's Patronage (EIT).