การลดรอบเวลาการผลิตของกระบวนการประกอบแผงวงจรกล่องแปลงสัญญาณภายนอกอาคาร ในสถานีงานผ่านคลื่นน้ำตะกั่ว
Main Article Content
Abstract
This research is intended to reduce manufacturing cycle time of components assembly on Printed Circuit Board of backhaul networks smoothing transformation product at the Wave soldering station. That has the production cycle time higher than the factory targeted. This research was analyzing on the cycle time elements according to Wallace J. Hopp and Mark L. Spearman through the Simulation Model. The results showed that 38.40 % of manufacturing cycle time was reduction.