Integrated Fuzzy Logic and AHP-TOPSIS for Suitable Turbine Set Selection of Pumped Hydro Storage Powerplant: A Case Study from Thailand

doi: 10.14456/mijet.2021.2

Authors

  • Suthinee Wiangdow Khon Kaen University
  • Jarupol Suriyawanakul Khon Kaen University

Keywords:

MCDA, fuzzy logic, fuzzy AHP, fuzzy TOPSIS

Abstract

The purpose of this study is selecting the suitable turbine set for operating the 1,200 MW hydro powerplant at Chulabhorn Dam in Thailand to balance the system. This paper uses Multicriteria Decision Analysis (MCDA) technology by combining fuzzy Analytic Hierarchy Process method (AHP) for weighting criteria and fuzzy Technique for Order Preference by Similarity to an Ideal Solution method (TOPSIS) for prioritizing decision. Six criteria are involved: efficiency and flexibility generation mode, efficiency and flexibility pumped mode, cost, and installation space. There are ten alternatives integrated between three turbines including fixed speed turbine (fi), variable speed turbine by Doubly fed induction machines (df), and variable speed turbine by Full Size Frequency Converter (fs) to power the 1,200 MW generator. As a result, the suitable turbine set in the plant is three of variable speed turbines by Full Size Frequency Converter (fs3) because of its greatest distance from FNIS. Furthermore, this study shows the capability form mixing variety turbine in plant more effective than using the only type of turbine in a plant.

References

B. Bhandari, K. T. Lee, G. Y. Lee, Y. M. Cho, and S. H. Ahn, “Optimization of hybrid renewable energy power systems: A review,” Int. J. Precis. Eng. Manuf. - Green Technol., vol. 2, no. 1, pp. 99–112, 2015, doi: 10.1007/s40684-015-0013-z.

E. Ela, B. Kirby, A. Botterud, C. Milostan, I. Krad, and V. Koritarov, “Role of Pumped Storage Hydro Resources in Electricity Markets and System Operation,” HydroVision Int. Denver, Color. July 23-26, 2013, no. May, pp. 1–12, 2013, doi: NREL/CP-5500-58655.

Storage Power Plants, “Advantages of Variable Speed Pump Turbines for adjusting Power Supply,” Mitsubishi Heavy Ind. Tech. Rev., vol. 48, no. 3, pp. 45–47, 2011.

E. Erayman, “Need for Adjustable Speed Pump Storage Turbines in the Systems Having Large Capacity of Conventional and Pumped Storage Power Plants: A case study for Turkey,” 2016.

C. Yang, X. Yang, and Y. Chen, “Integration of variable speed hydropower generation and VSC HVDC,” 2015 17th Eur. Conf. Power Electron. Appl. EPE-ECCE Eur. 2015, 2015, doi: 10.1109/EPE.2015.7309425.

D. Beevers, L. Branchini, V. Orlandini, A. De Pascale, and H. Perez-Blanco, “Pumped hydro storage plants with improved operational flexibility using constant speed Francis runners,” Appl. Energy, vol. 137, pp. 629–637, 2015, doi: 10.1016/j.apenergy.2014.09.065.

T. Electric, P. Company, T. Electric, and P. Services, “Final Report on Feasibility Study on Adjustable Speed Pumped Storage Generation Technology Japan International Cooperation Agency ( JICA ) Tokyo Electric Power Company Tokyo Electric Power Services,” no. January, 2012.

S. Wiangdow and J. Suriyawanakul, “Study of Optimal Turbine Set for Pumped Hydro-Storage Power Plant at Chulabhorn Dam, Thailand,” Ladkrabang Eng. J., vol. 36, 2019.

S. J. Williamson, B. H. Stark, and J. D. Booker, “Low head pico hydro turbine selection using a multi-criteria analysis,” Renew. Energy, vol. 61, pp. 43–50, 2014, doi: 10.1016/j.renene.2012.06.020.

A. Mardani et al., “A review of multi-criteria decision-making applications to solve energy management problems: Two decades from 1995 to 2015,” Renew. Sustain. Energy Rev., vol. 71, no. November 2016, pp. 216–256, 2017, doi: 10.1016/j.rser.2016.12.053.

A. Ishizaka and A. Labib, “Analytic Hierarchy Process and Expert Choice : Benefits and limitations,” OR Insight, vol. 22, no. 4, pp. 201–220, 2009, doi: 10.1057/ori.2009.10.

I. Ertuǧrul and N. Karakaşoǧlu, “Comparison of fuzzy AHP and fuzzy TOPSIS methods for facility location selection,” Int. J. Adv. Manuf. Technol., vol. 39, no. 7–8, pp. 783–795, 2008, doi: 10.1007/s00170-007-1249-8.

A. Kumar et al., “A review of multi criteria decision making (MCDM) towards sustainable renewable energy development,” Renew. Sustain. Energy Rev., vol. 69, no. November 2016, pp. 596–609, 2017, doi: 10.1016/j.rser.2016.11.191.

T. Aktan, “Decision Making On Turbine Types And Capacities For Run-Of-River Hydroelectric Power Plants A Case Study On Eglence-1 Hepp Master Thesis, İzmir Institute of Technology, Urla, 2013.

S. Data and N. Head, “Chapter – 3 hydraulic turbine classification and selection 3.1,” in MODERN HYDROELECTRIC ENGINEERING PRACTICE IN INDIA ELECTRO-MECHANICAL WORKS, 2003, pp. 53–109.

V. Belton and T. Stewart, “What is MCDA?,” in Multiple Criteria Decision Analysis: An Integrated Approach, 2001, pp. 1–15.

M. Shaverdi, I. Ramezani, R. Tahmasebi, and A. A. A. Rostamy, “Combining Fuzzy AHP and Fuzzy TOPSIS with Financial Ratios to Design a Novel Performance Evaluation Model,” Int. J. Fuzzy Syst., vol. 18, no. 2, pp. 248–262, 2016, doi: 10.1007/s40815-016-0142-8.

C. C. Sun, “A performance evaluation model by integrating fuzzy AHP and fuzzy TOPSIS methods,” Expert Syst. Appl., vol. 37, no. 12, pp. 7745–7754, 2010, doi: 10.1016/j.eswa.2010.04.066.

A. T. Gumus, “Evaluation of hazardous waste transportation firms by using a two step fuzzy-AHP and TOPSIS methodology,” Expert Syst. Appl., vol. 36, no. 2 PART 2, pp. 4067–4074, 2009, doi: 10.1016/j.eswa.2008.03.013.

M. Hanine, O. Boutkhoum, A. El Maknissi, A. Tikniouine, and T. Agouti, “Decision making under uncertainty using PEES–fuzzy AHP–fuzzy TOPSIS methodology for landfill location selection,” Environ. Syst. Decis., vol. 36, no. 4, pp. 351–367, 2016, doi: 10.1007/s10669-016-9609-2.

A. Balin and H. Baraçli, “A fuzzy multi-criteria decision making methodology based upon the interval Type-2 fuzzy sets for evaluating renewable energy alternatives in Turkey,” Technol. Econ. Dev. Econ., vol. 23, no. 5, pp. 742–763, 2017, doi: 10.3846/20294913.2015.1056276.

S. Rehman and S. A. Khan, “Fuzzy logic based multi-criteria wind turbine selection strategy - A case study of Qassim, Saudi Arabia,” Energies, vol. 9, no. 11, pp. 1–26, 2016, doi: 10.3390/en9110872.

R. Mosadeghi, J. Warnken, R. Tomlinson, and H. Mirfenderesk, “Computers , Environment and Urban Systems Comparison of Fuzzy-AHP and AHP in a spatial multi-criteria decision making model for urban land-use planning,” Comput. Environ. Urban Syst., vol. 49, pp. 54–65, 2015, doi: 10.1016/j.compenvurbsys.2014.10.001.

S. Vinodh, M. Prasanna, and N. Hari Prakash, “Integrated Fuzzy AHP-TOPSIS for selecting the best plastic recycling method: A case study,” Appl. Math. Model., vol. 38, no. 19–20, pp. 4662–4672, 2014, doi: 10.1016/j.apm.2014.03.007.

V. G. Venkatesh, A. Zhang, E. Deakins, S. Luthra, and S. Mangla, “A fuzzy AHP-TOPSIS approach to supply partner selection in continuous aid humanitarian supply chains,” Ann. Oper. Res., vol. 283, pp. 1517–1550, 2018, doi: 10.1007/s10479-018-2981-1.

N. D. Chakladar and S. Chakraborty, “A combined TOPSIS-AHP-method-based approach for non-traditional machining processes selection,” Proc. Inst. Mech. Eng. Part B J. Eng. Manuf., vol. 222, no. 12, pp. 1613–1623, 2008, doi: 10.1243/09544054JEM1238.

A. Balin, H. Demirel, and F. Alarcin, “A novel hybrid MCDM model based on fuzzy AHP and fuzzy TOPSIS for the most affected gas turbine component selection by the failures,” J. Mar. Eng. Technol., vol. 15, no. 2, pp. 69–78, 2016, doi: 10.1080/20464177.2016.1216252.

D. Choudhary and R. Shankar, “An STEEP-fuzzy AHP-TOPSIS framework for evaluation and selection of thermal power plant location: A case study from India,” Energy, vol. 42, no. 1, pp. 510–521, 2012, doi: 10.1016/j.energy.2012.03.010.

M. S. Kuo, G. H. Tzeng, and W. C. Huang, “Group decision-making based on concepts of ideal and anti-ideal points in a fuzzy environment,” Math. Comput. Model., vol. 45, no. 3–4, pp. 324–339, 2007, doi: 10.1016/j.mcm.2006.05.006.

T. C. Wang and T. H. Chang, “Application of TOPSIS in evaluating initial training aircraft under a fuzzy environment,” Expert Syst. Appl., vol. 33, no. 4, pp. 870–880, 2007, doi: 10.1016/j.eswa.2006.07.003.

J. J. Buckley, “Fuzzy Heirarchical Analysis,” Fuzzy Sets Syst., vol. 17, no. 17, pp. 233–247, 1985.

Published

2020-08-11

How to Cite

Wiangdow, S., & Suriyawanakul, J. (2020). Integrated Fuzzy Logic and AHP-TOPSIS for Suitable Turbine Set Selection of Pumped Hydro Storage Powerplant: A Case Study from Thailand: doi: 10.14456/mijet.2021.2. Engineering Access, 7(1), 6–15. Retrieved from https://ph02.tci-thaijo.org/index.php/mijet/article/view/10.14456.mijet.2021.2

Issue

Section

Research Papers