Contractor’s Pre-Registration Model for Irrigation Construction

Main Article Content

Sumit Surapanpairoj
Paijit Pawan

Abstract

The objective of this study was to develop a prequalification model for irrigation constructors using an Analytical Hierarchy Process (AHP). Firstly, Contractor prequalification involves screening candidate contractors based on a set of criteria established by each project owner. The model implemented based on, the 30 pre-qualified lists were collected from the registration system by the Royal Irrigation Department (RID). The expert’s creativity scores on a couple for the calculating weighted rating of the 4 eligibility factors. For example, the experience and performance, the competence related to financial status, the competence related to staff, the machine-tool-related performance become the input of the PQ-AHP model. The weighted values of main factors show the percentage of the experience and performance, the financial status, the officer/staff and the machine-equipment are 25.14, 54.87, 11.61 and 8.38 respectively. In this study, there are 6 situations of the RID pre-qualified candidate lists for comparing the accuracy of the model with the decision making criteria additionally. The results from the 1st scenario and the 5th scenario results reveal that as same the RID qualifications but the 6th scenario results which considering the RID qualifications enlisted from contractors who are ranked third to fourth hierarchy according to the model result of low weight in financial status show that the contractor moved to the fourth tier. Finally, those results indicate that the PQ–AHP model was flexible and consistent with the Pre-Qualification results of RID. The Primary and secondary factors can be updated in the model at all time.

Article Details

Section
บทความวิจัย

References

Balubaid, M. and Alamoudi, R. (2015). Application of the Analytical Hierarchy Process (AHP) to Multi-Criteria Analysis for Contractor Selection, Department of Industrial Engineering. American Journal of Industrial and Business Management, 5, 581-589.

Dechakhum, P. Apirattanapimolchai, A. and Charoensuk, S. (2017). Criteria for Selection of Contractors for Construction Work on The Industrial Estate in Chonburi. Sripatum Chonburi Journal, 14(1), 192-201. (in Thai)

Jaisung, S. and Teeranupattana, A. (2012). Selection of Logistics Service Providers of Hana Microelectronics Public Company Limited by Applying the Analytic Hierarchy Process (AHP). Journal of Business Administration, 35(134), 65-89. (in Thai)

Janthaban, S. (2013). Proper Characters of Contractors for Bridge and Highway Construction Projects of The Department of Highways. Thesis of the Degree of Master of Engineering Program in Civil Engineering. Nakhon Ratchasima: Suranaree University of Technology. (in Thai)

Kwansai, W. and Pawan, P. (2020). A Selection of Formwork system for Hi-Rise Building Project by AHP Based Model. The Proceedings of the 24th National Convention in Civil Engineering, July 10-12, 2019, Udonthani, 1-8. (in Thai)

Mustafa, M. A. and Al-Bahar, J. F. (1991), Project risk assessment using the analytic hierarchy process. EEE Transactions on Engineering Management, 38, 46-52.

Pawan, P. and Lertpaitoonpan, W. (2018). Appraisal of not Wearing Personal Protective Equipment during Construction Work. The Proceedings of the 23th National Convention in Civil Engineering, July 18-20, 2018, Nakhonnayok, 1-7. (in Thai)

Promsiri, A. And Pawan, P. (2018). Lag Time in Project Scheduling Network with respect to Risk event of Weir Construction. Thesis of the Degree of Master of Engineering Program in Civil Engineering. Bangkok: Sripatum University. (in Thai)

Royal Irrigation Department. (2017). Criteria and methods of selection to be listed as a person with preliminary qualifications in the construction contract irrigation construction (Revised Edition). [Online]. Retrieved June 26, 2021, from : http://supply.rid.go.th/_data/docx/asset/หลักเกณฑ์และวิธีคัดเลือก%20ปรับปรุงใหม่update2.pdf (in Thai)

Russell, J. S. and Skibniewski, M. J. (1990). QUALIFIER-1: contractor prequalification model. Cambridge, England: ASCE.

Saaty, T. (1980). The Analytic Hierachy Process. New York, USA: McGraw-Hill.

Sreesai, B. (2014). Study of Factors Causing Delays in Dam and Irrigation Construction using Analytic Hierarchy Process. Thesis of the Degree of Master of Engineering Program in Construction Engineering and Management. Bangkok: King Mongkut’s University of Technology Thonburi. (in Thai)

Srinuan et al. (2016). Application of the Analytic Hierarchy Process on Warehouse Location Selection Factors. Business Review, 8(2), 75-90. (in Thai)

Sukkrajang, K. (2015). The Application of An Analytic Hierarchy Process of the Decision Process for Selection of 3rd Party Logistics Service Provider in the Textile Industry. Industrial Technology Lampang Rajabhat University Journal, 8(1), 1-11. (in Thai)

Tansirikongkol, W. (2014). Advanced decision for organization progress and public well-being. Bangkok: Amarin Printing & Publishing. (In Thai)

Vudhivanich, V. (2010). Decision Making by Analytic Hierachy Process. [Online]. Retrieved June 20, 2010, from: http://irre.ku.ac.th/PubArt/ PubArt/53-AHPpaper.pdf (in Thai)