The Improving Productivity in Seasonal Product Manufacturing by Motion and Time Study and Jig Design

Main Article Content

Panya Sumranhun
Naphob Saisuwan
Suphot Rungcharoen
Burapa Damrongwatthanayothin
Sumet Puinun
Wasan Ruamsup
Ploypailin Virayasiri

Abstract

Increasing productivity is key to fulfilling customer requirements and remaining competitive in today's fast-paced business world. The purpose of this research was to increase the productivity of sprinkler parts. Through the analysis of motion and time, it was discovered that the leaf stamping process and the leaf and stalk arc stages exceeded the Takt time. To address this issue, left-right hand charts and jig design were used to minimize work waste. The research yielded a reduction in the processing time of the leaf stamping process from 7.07 seconds to 3.02 seconds, a reduction of 57.25 percent, and the stem and leaf arc process time was reduced from 7.77 seconds to 2.97 seconds, a reduction of 61.78 percent, respectively. These improvements helped the company in the case study to produce according to customer demand and reduce its inventory levels.

Article Details

How to Cite
Sumranhun, P., Saisuwan , N. ., Rungcharoen , S., Damrongwatthanayothin , B. ., Puinun , S. ., Ruamsup , W. ., & Virayasiri, P. . (2024). The Improving Productivity in Seasonal Product Manufacturing by Motion and Time Study and Jig Design. Thai Industrial Engineering Network Journal, 10(1), 51–59. Retrieved from https://ph02.tci-thaijo.org/index.php/ienj/article/view/249249
Section
Research and Review Article

References

กัญญ์พัสวี กล่อมธงเจริญ, โสภณ ฟองเพชร, ปิยวรรณ สิริประเสริฐศิลป์, ประภัสสร วรรณสถิตย์. การศึกษาความต้องการสินค้าเกษตรอินทรีย์ของร้านอาหารที่ตั้งอยู่ในมหาวิทยาลัยแม่โจ้จังหวัดเชียงใหม่. วารสารวิทยาการจัดการ มหาวิทยาลัยราชภัฏเชียงราย. 2564; ปีที่ 16, ฉบับที่ 1:124-48.

อาสาฬห์ อุตตาลกาญจนา. การเปรียบเทียบต้นทุนการผลิตและต้นทุนโลจิสติกส์ของการปลูกผักสลัดแบบไฮโดรโปนิกส์และอินทรีย์ในแต่ละฤดูกาลของจังหวัดนครสวรรค์. วารสารวิชาการเทคโนโลยีอุตสาหกรรมและวิศวกรรมมหาวิทยาลัยราชภัฏพิบูลสงคราม. 2565; ปีที่ 4, ฉบับที่ 1: 74-91.

Biswas, S., Chakraborty, A., & Bhowmik, N. Improving productivity using work study technique. International Journal of Research in Engineering and Applied Sciences, 2016; Volume 6: 49-55.

Sivaraman, P., Nithyanandhan, T., Lakshminarasimhan, S., Manikandan, S., & Saifudheen, M. Productivity enhancement in engine assembly using lean tools and techniques, International Conference on Future Generation Functional Materials and Research (ICFMR 2020), Proceeding, 2020, 201-207.

Moktadir, M. A., Ahmed, S., Zohra, F. T., & Sultana, R. Productivity improvement by work study technique: a case on leather products industry of Bangladesh. Ind. Eng. Manag, 2017; Volume 6, Issue 1: 1000207.

Nallusamy, S. Execution of lean and industrial techniques for productivity enhancement in a manufacturing industry, International Conference on Newer trends and Innovations in Mechanical Engineering (ICONTIME 2020), Proceeding, 2020, 568-575.

นพมณี วัฒนสังสุทธ และวรพจน์ มีถม. การปรับปรุงกระบวนการปั๊มขึ้นรูปในอุตสาหกรรมชิ้นส่วนรถยนต์. วารสารวิชาการเทคโนโลยีอุตสาหกรรม. 2564; ปีที่ 17, ฉบับที่ 3:79-98.

สุชาดี ธำรงสุข และสมชาย เปรียงพรม. การประยุกต์ใช้แนวคิดแบบลีนปรับปรุงกระบวนการผลิตท่อส่งน้ำมันรถแทรกเตอร์: กรณีศึกษาบริษัทเอ.บี.ซีจำกัด. วารสารวิชาการเทคโนโลยีอุตสาหกรรม. 2564; ปีที่ 17, ฉบับที่ 3: 56-78.

ธรรมศักดิ์ ค่วยเทศ. การคำนวณหาค่าเวลา มาตรฐานการทำงานของพนักงาน: กรณีศึกษา อุตสาหกรรมโรงแรม. วารสารวิทยาลัย โลจิสติกส์และซัพพลายเชน. 2564; ปีที่ 7, ฉบับที่ 1: 5-18.

Rungreunganun, V., & Sriwasut, T. Productivity improvement for heating ventilation and air conditioning unit assembly. Songklanakarin J. Sci. Technol, 2018; Volume 40, Issue1: 219-230.