Process Improvement for Combining Production Lines with Work Study and Line Balancing Techniques: A Case Study of Stereo Manufacturer

Main Article Content

Poom Luangjamekorn
Siravit Swangnop
Todsaporn Kulngamnet

Abstract

An objective of this research is to study and improve the production process to reduce the usage of production area by combining production lines. A case study factory was a stereo manufacturer which needed the area for a new production line. A methodology started from studying and analyzing each production process, then choosing the production line to be removed and finally improving the production line to receive products from the removed production line. Main concepts for analysis and improvement consisted of work study, capability analysis and line balancing. The selected production lines to be combined considered from capacity utilization rate and limitations of the equipment and machine. An improvement of the production line to receive products from the removed production line was to sequence tasks to stations by considering line balancing, cycle time and production conditions. After reducing the line and improving the process, the factory had an additional area as expected and could move the product to produce in another line without any problems. In addition, reducing the production line and moving products to be produced in another line also increased capacity utilization rate from 32 % to 55%.

Article Details

How to Cite
Luangjamekorn, P., Swangnop, S., & Kulngamnet, T. . (2024). Process Improvement for Combining Production Lines with Work Study and Line Balancing Techniques: A Case Study of Stereo Manufacturer. Thai Industrial Engineering Network Journal, 10(1), 39–50. Retrieved from https://ph02.tci-thaijo.org/index.php/ienj/article/view/250995
Section
Research and Review Article

References

Amaluk A, Watthanasoei S. The Efficiency Improvement by Concurrent Engineering and ECRS Technique: A Case Study in Automotive Small Parts Manufacturer. Thai Industrial Engineering Network Journal. 2019; 5: 21-27.

Srisawangwong T, Yodpijit N. Work improvement in an Automotive Parts Factory. Thai Industrial Engineering Network Journal. 2016; 2: 33-40.

Choosombut N, Osothsilp N. Reduction of Total Cost Related to Burrs in Metal Sheet Forming Process of Oil Pan. Thai Industrial Engineering Network Journal. 2021; 7: 79-92.

Siri-O-Ran P, Tantibadaro V, Wongdeeying A, Jamnarnwej P. Labor Productivity Improvement in Soft Bread Shaping Process. Thai Industrial Engineering Network Journal. 2021; 7: 23-31.

Pinchaimoon P, Lueachai S. Kaizen Concept for Improvement Work Method in Rice Cracker Process. Thai Industrial Engineering Network Journal. 2020; 6: 1-7.

Srisawat P. Improvement of Khao-Pong production process to create a sustainable competitiveness for Baan Nong Loeng community enterprise group, Kan Noi, Kham Khuean Kaeo District, Yasothon. UBU Engineering Journal. 2020; 13: 27-41.

Khunprom K, Puasakul K, Swangnop S, Vilasdaechanont A. Process Improvement in Wooden Pallet Factory. Thai Industrial Engineering Network Journal. 2021; 7: 90-99.

Voranan V, Ngaoprasertwong J. Increasing Good Quality Production Rate of Synthetic Staple Fiber Process. Engineering Journal Chiang Mai University. 2021; 28: 112-125.

Nampan P, Theerathammakorn S, Teekasap S. Efficiency Improvement of Cosmetic Tube Filling Machine by Applying QC Tools. Thai Industrial Engineering Network Journal. 2021; 7: 32-41.

Sapew A, Peerapattana P. An Efficiency Improvement of the Rotor Assembly Line: A Case Study ABC Automotive Parts Factory. The Journal of King Mongkut's University of Technology North Bangkok. 2022; 32: 5-14.