A Study on Significant Problems from Construction Drawings and Specifications in Building Construction
Main Article Content
Abstract
Construction drawings and specifications that are inconsistent with the work on the construction site. The above problems affect the success of the building construction projects in terms of time, cost
and quality of work. The purpose of this research is to study problems of construction drawings and specifications in construction projects. Various problems arising in each project and interviews with people involved in the construction project were gathered to create a questionnaire. The data were analyzed using descriptive and inferential statistics. The hypotheses, opinions of business groups and working experience were tested on the problems of the construction drawings and the specifications of construction projects. The results of the study found that the significance index (SI) of the most problematic issues focused on the following issues: 1) Problems arising from the accompanying list of unclear scope of work, 2) Problems arising from the structure plan, indicating the position and distance of the opening, conflict with the architectural design and the building system assembly, 3) Problems arising from unspecified or incomplete architectural drawings. In addition, the hypothesis testing found that the business group and work experience had different opinions on several problems. Finally, this research recommends the preparation of a checklist for the correctness and completeness of the construction drawings and the specifications to support the construction project's goals.
Article Details
This work is licensed under a Creative Commons Attribution-NonCommercial-NoDerivatives 4.0 International License.
Copyright belongs to Srinakharinwirot University Engineering Journal
References
W. Jongchuwanit “Study of Bringing in Construction Drawings and their Specification to Building Construction Works,” M.Eng, King Mongkut’s University of Technology Thonburi, Graduate School, 2004.
P. Pansuntia “The Study Level of The Construction Management of The Executive Municipality of Nakhon ratchasima Province,” M.Eng, Suranaree University of Technology, 2010.
V. Kijwatthanaboon “New approach in crash programming : refurbishing an old factory to modern factory ; a case study of Electronics (Thailand) Co.,Ltd,” Department of Architectural Technology, Silpakorn University, Graduate School, 2012
S. Senanan, “Construction Drawing,” Technology Promotion Association (Thailand-Japan), vol. 7, 2011.
K. Lueprasert “Quality Systems in Construction,” King Mongkut’s University of Technology North Bangkok, 2003.
T. Yamane, “Statistics : An Introductory Analysis,” New York : Harper and Row Publication, vol. 3, 1973.
Rovinelli, R.J and Hambleton, R.K, “On the use of content specialists in the assessment of criterion-referenced test item validity,” Dutch Journal of Educational Research, vol. 2, pp.49-60, 1977.
K. Vanichbuncha “Statistical Analysis : Statistics For Administration and Research,” Chulalongkorn University Publishing House, 2002.
Said A. Assaf and Sadiq Al-Hejji, “Causes of delay in large construction project,” International Journal of Project Management, Vol. 24, pp.350 –351, May 2006.
L. Muhwezi, J. Acai and G. Otim, “Causes of delay in large construction project,” International Journal of Construction Engineering and Management, vol. 3, no. 1, pp.18, 2014.
Berlinda Lessing, Derek Thurnell, Serdar Durdyev, “Main Factors Causing Delays In Large Construction Projects:Evidence From New Zealand,” Journal of Management, Economics, and Industrial Organization, vol. 1, no. 2, pp.63-82, 2017.
W. Kittiprapanun “A Study of Problems of Construction Delay in High Rise Building Projects in Bangkok,” M.Eng, King Mongkut’s University of Technology Thonburi, Graduate School, 2010.
W. Pattaranawic, “Guildlines for buildable design for Factory Construction in Thailand,” Department of Civil Engineering, Faculty of Engineering, Chulalongkorn University, Graduate School, 2003.