The correlation coefficient of cost management's problems in construction project of private hospital
Main Article Content
Abstract
This study is qualitative research. To investigate the issues with building project cost management. The complexity of structures, particularly hospital construction projects, is one of the factors that causes challenges with cost management. As a result, the goal of this study is to investigate the link between issues in the cost management process of private hospital building projects. The data was collected using a semi-structured interview technique in this study. A construction management specialist from a private hospital organization that earns more than half of Thailand's market share in the private hospital sector was chosen from a specialized approach to identify twelve professionals in hospital building project cost management. The typology analysis was used to conduct the analysis. using the bundled software to calculate the correlation coefficient The findings revealed that throughout the planning stage, the planning had a high degree of correlation coefficient (r=0.61) when measuring building project expenses. According to the findings, the two processes in Pearson's correlation coefficient analysis related to modest cost causation.
Article Details
References
ธนาคารกรุงศรี. เรื่อง แนวโน้มธุรกิจ/อุตสาหกรรม ปี 2563-65: ธุรกิจโรงพยาบาลเอกชน. 2563 เข้าถึงได้จาก: https://www.krungsri.com/th/research/industry/industry-outlook/Services/Private-Hospitals/IO/io-Private-Hospitals.
James PT. The impact of medical tourism on Thai private hospital management: informing hospital policy. Global journal of health science. 2012;4(1): 127.
Xia B, Chan AP. 2012. Measuring complexity for building projects: a Delphi study. Engineering, Construction and Architectural Management. 2012;19(1): 7-24.
A. Guide. Project management body of knowledge (pmbok® guide). USA: Project Management Institute; 2021.
Chitkara KK. Construction project management. USA: Tata McGraw-Hill Education; 1998.
Aziz RF. Factors causing cost variation for constructing wastewater projects in Egypt. Alexandria Engineering Journal. 2013;52(1): 51-66.
Chaithongrat T. and et al. Application of Confirmatory Factor Analysis in Government Construction Procurement Problems in Thailand. International Transaction Journal of Engineering, Management, & Applied Sciences & Technologies. 2017;8(3): 221-231.
Teanngen B. et al. Risk factors affecting conflict management for construction government project in Thailand. Multidisciplinary Technologies for Industrial Applications. River Publishers; 2020. p. 94-105
Peterson SJ. Construction accounting and financial management. New York: Pearson Upper Saddle River; 2013.
Hollmann JK. Total cost management framework to be released at AACE international’s 2006 annual meeting. Cost engineer. 2006;48(5): 8.
Kuen CW, Zailani S. Critical factors influencing the project success amongst manufacturing companies in Malaysia. African journal of business management. 2009;3(1): 016-027.
Ali AS, Kamaruzzaman SN. Cost performance for building construction projects in Klang Valley. J Journal of Building performance. 2010;1(1).
Mahamid I. Effects of project’s physical characteristics on cost deviation in road construction. Journal of King Saud University-Engineering Sciences. 2013;25(1): 81-88.
Toh TC. et al. Critical cost factors of building construction projects in Malaysia. Procedia-Social and Behavioral Sciences. 2012;57: 360-367.
Birmingham P, Wilkinson D. Using research instruments: A guide for researchers. London; Routledge: 2003.
Guest G, Bunce A, Johnson L. 2006. How many interviews are enough? An experiment with data saturation and variability. Field methods. 2006;18(1): 59-82.
Bernard HR, Bernard HR. Social research methods: Qualitative and quantitative approaches. USA: Sage; 2013.
Hatch JA. Doing qualitative research in education settings. USA: Suny Press; 2002.
Neuman WL. Social work research methods: qualitative and quantitative approaches: with Research Navigator. Boston: Pearson/Allyn and Bacon; 2006.
Memon AH. and et al. Factors affecting construction cost performance in project management projects: Case of MARA large projects. International Journal of Civil Engineering and Built Environment. 2014;1(1): 30-35.
Rahman IA, Memon AH, Karim ATA. 2013. Relationship between factors of Construction Resources Affecting Project. Modern Applied Science. 2013;7(1): 67-75.
American Psychological Association. Standards for educational & psychological tests. USA: American Psychological Association;1974.
Boddy R, Smith G. Statistical methods in practice: for scientists and technologists. USA: Wiley Online Library.;2009.