Abstract
Currently, building demolition primarily relies on destructive methods, generating a substantial amount of construction and demolition waste that is typically landfilled. This practice not only wastes valuable resources but also causes environmental pollution. Therefore, efficient waste management through systematic material sorting and planned deconstruction is crucial. Reusing dismantled components in new construction projects can significantly reduce both resource consumption and environmental burdens. This research aims to investigate the mitigation of environmental impacts in building construction by reusing structural components from a deconstructed building. A case study was conducted on the deconstruction of a 4-story residential building (apartment) to construct a 2-story school building. The quantities of the existing structural members were evaluated using BIM-based quantity takeoff, and the load-bearing capacities of the original columns and beams were analyzed. These components were then modified and substituted into the new school building's structure based on appropriate lengths and structural strength requirements. The results revealed that 55.71% of the structural components from the residential building could be successfully reused in the new school building. Based on a Life Cycle Assessment (LCA) from the material production phase to construction completion, carbon emissions were reduced by 39.35% compared to conventional construction methods. In terms of project management, the construction duration was shortened by 36.36%, and direct construction costs decreased by 23.07% compared to conventional construction methods. However, this study excluded the costs associated with the demolition and transportation of the reused structural members, which are variables that should be considered in future research.
Article Details
References
กรุงเทพธุรกิจ. ย้อนรอยสภาพอากาศสุดขั้วในรอบ 52 ปี ที่ไทยต้องเผชิญ. 2567. เข้าถึงได้จาก: https://www.bangkokbiznews.com/environment/1121502
องค์การบริหารจัดการก๊าซเรือนกระจก (องค์การมหาชน). แนวทางการประเมินคาร์บอนฟุตพริ้นท์ของผลิตภัณฑ์. พิมพ์ครั้งที่ 6. กรุงเทพมหานคร: องค์การบริหารจัดการก๊าซเรือนกระจก (องค์การมหาชน); 2561.
United Nations Environment Programme. Emissions gap report 2024: No more hot air … please! With a massive gap between rhetoric and reality, countries draft new climate commitments. Nairobi: United Nations Environment Programme; 2024. doi:10.59117/ 20.500.11822/46404.
จิรวัฒน์ ภู่งาม, ธีรพัฒน์ เขื่อนปัญญา, ธวัชชัย ยาวินัง. Urbanization การขยายตัวของเมืองในภูมิภาค. Regional Letter. 2566;(10). (ข้อมูลภายนอก)
German Federal Ministry for Economic Cooperation (BMZ). แนวทางปฏิบัติในการจัดการของเสียจากการก่อสร้างและรื้อถอน. อัจฉรา อัศวรุจิกุลชัย, ธัชวีร์ ลีละวัฒน์, อุษณีย์ อุยะเสถียร, ศยามล สายยศ, นิสา รัตนดิลก ณ ภูเก็ต, ผู้แปล. พิมพ์ครั้งที่ 1; 2548.
Bonifazi G, Grosso C, Palmieri R, Serranti S. Current trends and challenges in construction and demolition waste recycling. Current Opinion in Green and Sustainable Chemistry. 2025;53:101032. doi:10.1016/j.cogsc.2025. 101032.
Bayram B, Greiff K, Gerlich L, Luthin A, Hildebrand L, Traverso M. Environmental and economic implications of selective demolition and advanced recycling of construction waste. Sustainable Production and Consumption. 2025;57:61–79. doi:10.1016/j.spc.2025.05.007.
GXN Innovation. Circle House – Denmark’s first circular housing project. Copenhagen: GXN Innovation; 2020. Available from: https://gxn.3xn.com/project/circle-house
Joensuu T, Leino R, Heinonen J, Saari A. Developing buildings’ life cycle assessment in circular economy—comparing methods for assessing carbon footprint of reusable components. Sustainable Cities and Society. 2022;77:103499. doi:10.1016/j.scs.2021.103499.
สำนักงานคณะกรรมการการศึกษาขั้นพื้นฐาน. บัญชีราคาค่าวัสดุก่อสร้างและค่าแรงงาน. กรุงเทพมหานคร: สำนักงานคณะกรรมการการศึกษาขั้นพื้นฐาน; 2569.
กรมสนับสนุนบริการสุขภาพ กระทรวงสาธารณสุข. มาตรฐานภาระงานในการก่อสร้าง. กรุงเทพมหานคร: กองแบบแผน กรมสนับสนุนบริการสุขภาพ กระทรวงสาธารณสุข; 2562.
Vasishta T, Mehany MSHM, Killingsworth J. Comparative life cycle assessment (LCA) and life cycle cost analysis (LCCA) of precast and cast-in-place buildings in United States. Journal of Building Engineering. 2023;67:105921. doi:10.1016/j.jobe.2023.105921.
กรมบัญชีกลาง. บัญชีค่าแรงงาน/ดำเนินการสำหรับถอดแบบคำนวณราคากลางงานก่อสร้าง. กรุงเทพมหานคร: กรมบัญชีกลาง; 2568.
Dong YH, Jaillon L, Chu P, Poon CS. Comparing carbon emissions of precast and cast-in-situ construction methods—a case study of high-rise private building. Construction and Building Materials. 2015;99:39–53. doi:10.1016/ j.conbuildmat.2015.08.145.
Chang R, Zhang N, Gu Q. A review on mechanical and structural performances of precast concrete buildings. Buildings. 2023;13(7):1575. doi:10.3390/buildings13071575.