Factors Affecting Delay of Construction Projects

Main Article Content

Titiwat Triwong
Nirat Yamoat
Adisorn Pongsuwan

Abstract

The research is aimed to 1) study the level and priority of the factors affecting the delay of construction projects and 2) provide suggestions in relation to the prevention of such delay. The sample is 520 people who were working for different construction projects. They were project managers, project engineers, field engineers, and foremen. The data were collected by using online questionnaires and analyzed to find out mean, standard deviation (SD), frequency, correlation coefficient, and confirmatory factor analysis. The findings reveal two significant aspects. First, those who were working in the construction projects concerned about the factors affecting the delay of the projects at high level.  Respectively, the factors related to design, resource, external factors and others were taken into consideration. The factor regarding to work performance is regarded affecting the project delay at the highest level. Other factors, i.e., the design, external factors and others, and resource have the affects at the lower level.  Second, the work-related factors can help prevent the project delay. In other words, the construction plan and methods as well as the project management should be well-implemented in accordance with the design. The construction site should be on inspection considering its drawing. Regarding the external factors and others, the public voices of those living around the construction site should be taken into consideration. Furthermore, the effective use of the resources can be carried out by sufficiently preparing all materials, tools, and equipment for constructing any project effectively as a consequence.

Article Details

How to Cite
[1]
T. Triwong, N. Yamoat, and A. Pongsuwan, “Factors Affecting Delay of Construction Projects”, RMUTP RESEARCH JOURNAL, vol. 16, no. 2, pp. 127–140, Dec. 2022.
Section
บทความวิจัย (Research Articles)

References

B. B. Bramble and M. T. Callahan, Construction Delay Claims, USA: John Wiley & Sons, 1987.

M. Gunduz, Y. Nielsen and M. Ozdemir, “Quantification of delay factors using the relative importance index method for construction projects in Turkey,” Journal of Management in Engineering, vol. 29, no. 2, pp. 133-139, Apr. 2013.

R. F. Aziz, “Ranking of delay factors in construction projects after Egyptian revolution,” Alexandria Engineering Journal, vol. 52, pp. 387-406, Apr. 2013.

J. K. Larsen, G. Q. Shen, S. M. Lindhard and T. D. Brunoe, “Factors affecting schedule delay, cost overrun, and quality level in public construction projects,” Journal of Management in Engineering, vol. 32, no. 1, pp. 04015032: 1-10, Nov. 2016.

O. Abbasi, E. Noorzai, K. G. Jafari and M. Golabchi, “Exploring the causes of delays in construction industry using a cause-and-effect diagram: case study for Iran,” Journal of Architectural Engineering, vol. 26, no. 3, pp. 05020008: 1-10, Dec. 2020.

Y. C. Kog, “Project management and delay factors of public housing construction,” Practice Periodical on Structural Design and Construction, vol. 23, no. 1, pp. 04017028: 1-8, Apr. 2018.

Y. C. Kog, “Construction delays in Indonesia, Malaysia, Thailand, and Vietnam,” Practice Periodical on Structural Design and Construction, vol. 24, no. 3, pp. 04019013: 1-12, Sep. 2019.

M. Kadry, H. Osman and M. Georgy, “Causes of construction delays in countries with high geopolitical risks,” Journal of Construction Engineering and Management, vol. 143, no. 2, pp. 04016095: 1-11, Jan. 2017.

M. Magdy, M. Georgy, H. Osman and M. Elsaid, “Delay analysis methodologies used by engineering and construction firms in Egypt,” Journal of Legal Affairs and Dispute Resolution in Engineering and Construction, vol. 11, no. 3, pp. 04519006: 1-11, Aug. 2019.

Y. C. Liu, A. Jarvamardi, Y. X. Zhang, M. Liu, S. M. Hsiang, S. J. Yang, X. X. Yu and Z. H. Jiang, “Comparative study on perception of causes for construction task delay in China and the United States,” Journal of Construction Engineering and Management, vol. 147, no. 3, pp. 040201176: 1-10, May 2021.

C. Sinsawat, “Factors causing delays in court of justice office,” M.S. thesis, Dept. CVET, KMUTNB, Bangkok, Thailand, 2017.

C. Kongpreechakul, “The study of risks affecting for the housing construction project: a case study of project owners,” M.S. thesis, Dept. CVET, KMUTNB, Bangkok, Thailand, 2019.

W. Kongsong and C. Pooworarulchai, “Cause of delay in the construction project by relative importance index method,” The Journal of KMUTNB, vol. 29, no. 2, pp. 270-281, Apr-Jun. 2019.

R. Seubsamut, “Study of delay causes in infrastructure construction projects in Bangkok,” I.S. thesis, Dept. CVET, KMUTNB, Bangkok, Thailand, 2019.

S. Tirakanun, Multivariate Analysis for Social Sciences, Bangkok: Chulalongkorn University Press, 2010.

L. Silanoi and K. Chindaprasert, “The use of rating scale in quantitative research on social sciences, humanities, hotel and tourism study,” Journal of Management Science, Ubon Ratchathani University, vol. 9, no. 15, pp. 112-126, Jan-Jun. 2019.

K. Vanichbuncha, Using SPSS for Windows in Data Analysis, Bangkok: Dharmasarn Printing House, 2017.