Classification and Management of Spare Parts Inventory: Case Study of Automotive Part Industry

Main Article Content

Suttichai Saaingram
ฺBanhan Lila
Jakrawarn Kunadilok
Ruephuwan Chantrasa

Abstract

Spare parts inventory management is a complex and crucial task that can affect the cost and effectiveness of the production processes. The objective of this research is to propose a classification method and spare parts inventory management policy of an electric vehicle battery manufacturer in order to solve the problem of high inventory costs and shortages of spare parts when needed. This research focuses on integrating ABC analysis with VED analysis aided by Analytical Hierarchy Process (AHP) techniques in criticality assessment and grouping of spare parts according to their priority level. The research collected data on spare parts available in the database between 2021 and 2023, which totaled 1200 items, and selected 115 moving spare parts for study, equivalent to a total expenditure of 2,093,415 baht. AHP-aided VED analysis identified 3 criteria for evaluating the criticality of spare parts: 1) significance to production, 2) type of spare parts, and 3) ordering lead time. Using ABC-VED matrix, spare parts were classified into 3 classes according to their importance from highest to lowest. Classes 1, 2, and 3 accounted for 12.17, 50.44, and 37.39 percent of spare parts, representing 65.12, 26.77, and 8.11 percent of the total expenditure value, respectively. The research proposed the reorder point Max-Min method for managing spare parts inventory for class 1 and 2 whereas order as required policy should be used for class 3 spare parts. This research is beneficial to the case study company, which is an automotive parts manufacturer, by significantly improving the efficiency of parts inventory management and machine maintenance systems.

Article Details

How to Cite
Saaingram, S. ., Lila ฺ., Kunadilok , J. ., & Chantrasa, R. (2026). Classification and Management of Spare Parts Inventory: Case Study of Automotive Part Industry. Thai Industrial Engineering Network Journal, 12(1). retrieved from https://ph02.tci-thaijo.org/index.php/ienj/article/view/262886
Section
Research and Review Article

References

จุฑารัตน์ พรหมทัต, เต็มศิริ กฤษณะวณิช, ศุจิรัตน์ สิทธิโรจน์, พรปวีณ์ รัสมี, บรรณาธิการ. สถานการณ์รถยนต์ไฟฟ้า โอกาสและความท้าทายของไทย. กรุงเทพ; 2567. กองนโยบายและยุทธศาสตร์การค้าสินค้าอุตสาหกรรมและธุรกิจบริการ สำนักงานนโยบายและยุทธศาสตร์การค้า กระทรวงพานิชย์.

อรรถกร เก่งพล. อุตสาหกรรมยานยนต์ไฟฟ้าและผลกระทบต่ออุตสาหกรรมไทย. วารสารวิชาการพระจอมเกล้าพระนครเหนือ. 2564; 31(4): 597-598.

Ayat M. A case study of spare parts inventory of printing industry using ABC and VED analysis. Merit Research Journal of Business and Management. 2017; 5(1): 1-7.

Gajpal P P, Ganesh L, Rajendran C. Criticality analysis for spare parts using the analytic hierarchy process. International Journal of Production Economics. 1994; 35: 293-297.

Roda I, Macchi M, Fumagalli L, Viveros P. A review of multi-criteria classification of spare parts from literature analysis to industrial evidences. Journal of Manufacturing Technology Management. 2014; 25(4): 528-549.

Kennedy W J, Patterson J W, Fredendall L D. An overview of recent literature on spare parts inventories. International Journal of Production Economics. 2002; 76: 201-215.

Molenaers A, Baets H, Pintelon L, Waeyenbergh G. Criticality classification of spare part: a case study. International Journal of Production Economics. 2012; 140: 570-578.

Partovi F Y, Burton J. Using the analytic hierarchy process for ABC analysis. International Journal of Operations & Production Management. 1993; 13(9): 29-44.

Beheshti H M, Grgurich D, Gilbert, F W. ABC inventory management support system with a clinical laboratory application. Journal of Promotion Management. 2012; 18(4): 414-435.

Mukhopadhyay S K, Pathak K, Guddu K. Development of decision support system for stock control at area level in mines. Institution of Engineers (India) Journal – Mining. 2003; 84(1): 11-16.

Saaty TM. The Analytic Hierarchy Process. New York: McGraw-Hill; 1980.

ปริญญา จันทรวินิช และศิริจันทร์ ทองประเสริฐ. การปรับปรุงระบบการคงคลังอะไหล่สำหรับเครื่องจักรการผลิต. วิศวกรรมสารฉบับวิจัยและพัฒนา. ปีที่ 24; ฉบับที่ 1: 58-66.

สายน้ำ ฤทธิ์อิ่ม และอรอุไร แสงสว่าง. นโยบายการควบคุมสินค้าคงคลังโดยการใช้คำสั่งซื้อแบบถาวร: กรณีศึกษา. วารสารวิชาการเทคโนโลยีอุตสาหกรรม. ปีที่ 9; ฉบับที่ 3: 105-117.

พงษ์ทัย กงยนต์. การจัดการอะไหล่สำหรับเครื่องรีดพลาสติก [งานนิพนธ์ปริญญาวิศวกรรมศาสตรมหาบัณฑิต]. ชลบุรี; มหาวิทยาลัยบูรพา; 2558.

Braglia M, Grassi A, Montanari R. Multi-attribute classification method for spare parts inventory management. Journal of Quality Maintenance Engineering. 2004; 10(1): 55-65.

Huiskonen J. Maintenance spare parts logistics: special characteristics and strategic choices. International Journal of Production Economics. 2001; 71:125-133.