Main Navigation
Main Content
Sidebar
Register
Login
English
ภาษาไทย
Toggle navigation
Current
Archives
Submissions
Announcements
Ethics
About
About the Journal
Editorial Team
Contact
Search
Home
Archives
Vol. 7 No. 2 (2021): Jul-Dec 2021
Published:
2021-12-29
Full Issue
Front Cover Vol.7 No.2 (ภาษาไทย)
Back Cover Vol.7 No.2 (ภาษาไทย)
Content Vol.7 No.2 (ภาษาไทย)
Editorial Team Vol.7 No.2 (ภาษาไทย)
Author Guidelines Vol.7 No.2 (ภาษาไทย)
Publication Flow Vol.7 No.2 (ภาษาไทย)
Peer Review Vol.7 No.2 (ภาษาไทย)
Research and Review Article
Improvement of Blood Donating Process in Blood Bank and Transfusion Medicine Unit, Songklanagarind Hospital
Wanatchapong Kongkaew, Kanwara Sunandhakasem, Sakesun Suthummanon, Tipparat Penglong Kongkaew, Warakorn Petkliang, Jirattacha Ninmote
1-12
pdf (ภาษาไทย)
Plant Layout and Design of Noodle Factory
Amornrat Pinchaimoon, Kumphol Jinta-amornchai, Natthaphol Sirirak
13-20
pdf (ภาษาไทย)
An Analysis of Container Yard Management of Rail Freight System: A Case Study of Rubber Product in Southern
Sakesun Suthummanin, Siriyaporn ฺBoonyarit, Wanatchapong Kongkaew, Nikorn Sirivongpaisal, Sivasit Wittayasilp, Pallapat Penjumrus, Aree Teeraparbseree , Sirirat Pungchompoo
21-28
pdf (ภาษาไทย)
Mixed Integer Linear Programming Based Heuristic for Job Shop Scheduling Problem
Jakrawarn Kunadilok, Patcharin Srisongsakun , Sanya Yimsiri , Ruephuwan Chantrasa
29-40
pdf (ภาษาไทย)
Disbursement Management of Hospital Medical Supplies with Kanban System
Nalinee Chanamool, Traiphop Sangthong , Suwat Kumban
41-50
pdf (ภาษาไทย)
Application of Saving Algorithm for Vehicle Routing Problem A Case Study of Catfish Farm
Ganokgarn Jirasirilerd, Natawut Ponsri, Thanaporn Insiri
51-58
pdf (ภาษาไทย)
Time-Driven Activity-Based Costing for Heart Disease with Cardiac Catheterization Patients Diagnosed Group: A Case Study of Songklanagarind Hospital
CHATCHADAPON NAKGAEW, Saksan Sutammanon, Aree Teeraparbseree, Pasuree Aangsupawanich, Sirirat Suwatcharachaitiwong, Nikorn Sirivongpaisal
59-74
pdf (ภาษาไทย)
Lot Sizing and Scheduling for Automobile Body Part Pressing Process
Jakrawarn Kunadilok, Radatorn Kittiyannont
75-89
pdf (ภาษาไทย)
Process Improvement in Wooden Pallet Factory
Kritsada Puasakul, Siravit Swangnop, Kan Khunprom, Amonsiri Vilasdaechanont
90-99
pdf (ภาษาไทย)
Impact of Various Situations on Production Scheduling: A Case Study of Automotive Company
Saowanit Lekhavat, Natnicha Arai
100-110
pdf (ภาษาไทย)
Propeller Mass Reduction of the Electric Motor in Ring-spinning Machine in Textile Industry for Energy Saving
Chalalai Wongwian, Kangsadan Sagulpongmalee , Chaleedol Inyasri
111-117
pdf (ภาษาไทย)